NUGENT are excited to begin our MEP works at St Paul’s School, new Junior School in London

January 13, 2025

NUGENT are excited to be involved with St Paul’s School, new Junior School extension which is in the heart of London. The school will enhance the learning environment for students and staff.

St Paul’s Junior School was founded in 1509 and is currently located at the current site of Barnes, West London which is adjacent to the River Thames. The Post Primary school currently provides education for around 1,000 boys aged 7-18 years old.

St Paul’s Junior School project consists of two new buildings which are Junior School East and Junior School West. The schools will be linked together by an external play space named, ‘The Barn’. Both extensions of the school will accommodate an additional 670 pupils. Architects have designed the college extension to RIBA Stage 3 with the project aiming to complete as a RIBA Stage 4 onwards.

(Architect: Hawkins \ Brown) 

Junior School West is the largest of the two buildings, with a 3-story facility for teaching space, changing facilities and a multi-functional exhibition space. Junior School East is a 2-storey facility with a teaching block and double height sports hall.

Additionally, the project will include external hard play, synthetic and grass pitches, tennis courts, school meals accommodation, car and bus parking and designated drop off area at the entrance onto Abbey Road.

(Architect: Hawkins \ Brown) 

NUGENT are working closely with Main Contractors Gilbert Ash whom have a wealth of experience within the Educational sector. We look forward to the development of the prestigious boys school.

The Post Primary School is targeting BREEAM ‘Excellent’. NUGENT are installing multiple specialist MEP services to ensure the desired rating including; air source heat pumps and photovoltaic panels on the roof.

Our MEP installation for the Junior School including but not limited too:

Mechanical services:

  • AC Installation
  • LTHW/Chilled water Installation
  • BMS Installation
  • AOV Smoke Vent System
  • Natural Vent
  • Ventilation and Local Exhaust
  • Underfloor heating
  • Above Ground drainage & Rainwater

Electrical Services:

  • Coordinated Containment Systems
  • Switchgear including Mains & Sub-mains Infrastructure
  • General Power Supplies & Meter Monitoring
  • General & Emergency Lighting
  • Lighting Control system
  • Lightning Protection system
  • Fire Alarm System
  • Security Systems
  • PA System
  • Disabled Toilet Call & Refuge Alarm System
  • Photovoltaic Installation
  • Specialised Lighting & Controls

The completion of the prestigious extension is estimated for completion early 2026. Stay tuned for more updates!